Increased Engine Oil Longevity in Renewable Energy Generating Plant

A landfill gas engine generating plant required frequent engine oil changes to maintain reliable operation.

7.2x Extension in Engine Oil Life | Gas Engine Case Study
case study

Increased Engine Oil Longevity in Renewable Energy Generating Plant

The challenge 

A landfill gas engine generating plant required frequent engine oil changes to maintain reliable operation. Delta-Xero conducted long-term, real-world testing with Enovert to assess how far engine oil life could be extended without compromising lubrication, cooling, protection, or cleanliness. Independent laboratory analysis was used to verify oil condition over time. 

Results confirmed a 7.2× extension in oil life, reducing oil changes from approximately 48 per year to just 7 in an engine requiring around 500 litres per oil change. 

Customer savings & impact 

Verified results delivered clear operational and environmental benefits: 

  • 20,500 litres/year reduction in new oil consumption 

  • 20,500 litres/year reduction in oil disposal 

  • 41 fewer oil changes per year, significantly reducing labour and plant downtime 

  • ~45,100 kg CO₂ reduction per year, lowering the site’s carbon footprint 

The full case study explains how oil condition was preserved, whichat lab data confirmed oil health, and what this means for long-term gas engine operation

Related Case Studies

79% Fewer Particles

A major Greek shipping company operating a large tanker fleet identified rising particle contamination levels in main engine lube oil

View Case Study

Slashing MPC Values by 85%

An offshore drilling platform in the offshore oil & gas industry experienced recurring reliability issues within its compressor lubrication system

View Case Study
contact us

Ready to transform your oil management?